Top of Site
Garvin Mesa Weather
Desert Weyr: Our Farm
Sales List
Black Welsh Mountain Sheep
CMK Arabian Horses
Geese and Chickens
Hops Variety Research Project
Desert Weyr Blog
Desert Weyr Cafe Press Shop
General Sheep Info
General Horse Info
Personal
Gordon-Van Tine Kit House Restoration
Hummer Information
Ken & Oogie
Colorado House Project
Mount Lamborn Picture Gallery
16870 Garvin Mesa Road
Paonia, CO 81428
(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time
Email at sales@desertweyr.com
|
May House Project Notes
Leveling the House
Once the footers were dry and ready to work the forms were removed and the work to install floor jacks and replace the wooden posts started. The resulting system must be exactly level. Here is the transit set up to make sure the house could be leveled properly.

Jacks are installed and the posts are removed.




This is what it looked like at the end. All level and ready for the block wall to start.

Because we are adding a radiant floor heating system we needed to beef up the whole floor to handle the extra weight. Here is a picture of one of the 48 foot manufactured beams that are going under the floor for added support. The cider press shed in the background is going to be removed and the garage put in its place.