07/05/2008 20:52:18  Temp. 68.4  F Humidity 48  % Wind NNE at 5  mph Barometer 30.163 -  in Rain 0.00  in

24 July
Top of Site


Garvin Mesa Weather


Desert Weyr: Our Farm

Sales List

Black Welsh Mountain Sheep

CMK Arabian Horses

Geese and Chickens

Hops Variety Research Project

Desert Weyr Blog


General Sheep Info

General Horse Info


Personal

Gordon-Van Tine Kit House Restoration

Hummer Information

Ken & Oogie

Colorado House Project

Mount Lamborn Picture Gallery


16870 Garvin Mesa Road
Paonia, CO 81428

(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time

Email at sales@desertweyr.com

May House Project Notes

First Blocks

The first course of blocks goes in.

Ready to Start

First Block

Blocks

First Block

Making sure the blocks are level and in the correct position.

Working on the east side where the fireplace will go.

East Side

East Side

After the blocks were finished the inside was filled with concrete.

Front Side

The next step is to lay a course of special U-shaped blocks with re-bar inside to pour a concrete beam. Hooks that are in the house beam are used to attach the house to the foundation.
Hook Detail

U-Blocks

U-Blocks

U-Blocks

Looking down the foundation. Rebar inside and the hooks connected to the wire ready to pour the concrete beam.

Beam

Hook Detail

After the beam is poured another course of thinner blocks is laid.

Blocks

Blocks

Because we're adding a radiant floor heat system to tehhouse we needed to reinforce the floor joists with an additional beam running the length of thehouse. Here is the large 48 foot beam after installation.

New Floor Beam

End of the day.

Front View