Top of Site
Garvin Mesa Weather
Desert Weyr: Our Farm
Sales List
Black Welsh Mountain Sheep
CMK Arabian Horses
Geese and Chickens
Hops Variety Research Project
Desert Weyr Blog
Desert Weyr Cafe Press Shop
General Sheep Info
General Horse Info
Personal
Gordon-Van Tine Kit House Restoration
Hummer Information
Ken & Oogie
Colorado House Project
Mount Lamborn Picture Gallery
16870 Garvin Mesa Road
Paonia, CO 81428
(970) 527-3573
FAX (815) 572-5360
8am-8pm
Mountain Time
Email at sales@desertweyr.com
|
June House Project Notes
Digging the Foundation for the Garage
Now that the house foundation is mostly done the next step is the garage. Here the foundation is dug out.


Drains on Uphill Side
Uphill from the house we are adding a french drain to prevent water damage to the new foundation. Here is the east and north side drain pipe.


Once the drain pipe is in, and covered with rock and a soil barrier material it is backfilled and packed down.

Deck Foundation
We have a deck planned for the south and east sides of the house. Here the pier footings are being set for the concrete piers for the south side deck.



More details on the footings for the piers. Once the footing is in place a sonotube is put on top and the whole thing braced for backfilling the foundation.







Go To Top
|